Cooperative Research Units
Education, Research And Technical Assistance For Managing Our Natural Resources
Home | Intranet | Digital Measures | Help

Dr. Cecil Jennings

Technical Publications

  • Sanchez, G. and C. A. Jennings. 2015. Identifying and Evaluating the Distribution of Fishes, Crab, and Shrimp in the Savannah River Estuary. Final Report (project number: W912HZ-14-2-0001) submitted to the Army Corps of Engineers. Savannah District.Abstract |
  • Sanchez, G. and C. A. Jennings. 2014. Identifying and Evaluating the Distribution of Fish in the Savannah River Estuary. Quarterly Summery - August 2014. Submitted to the US Army Corps of Engineers, Savannah, GA.Abstract |
  • Sanchez, G. and C. A. Jennings. 2014. Identifying and Evaluating the Distribution of Fish in the Savannah River Estuary. Quarterly Summery - May 2014. Submitted to the US Army Corps of Engineers, Savannah, GA.Abstract |
  • Peterson, R. C., C. A. Jennings, J. L. Shelton,Jr., J. Zelco, and J. E. Evans. 2008. Ecological studies of larval and juvenile robust redhorse Moxostoma robustum: abundance and distribution in the Oconee River, Georgia. Annual Report for Project Year 2006. Prepared for Georgia Power Company, Atlanta, GA.
  • Grabowski, T. B. and C. A. Jennings. 2008. Post-release movements and habitat use of stocked robust redhorse (Moxostoma robustum) in the Ocmulgee River, Georgia. Final Report for Project No. 2021RR272077 prepared for Georgia Power Company, Atlanta, GA. 70pp.
  • Ruiz, J., D. Dennerline, and C. Jennings. 2008. Fisheries Investigations (2007): Richard B. Russell and J. Strom Thurmond Reservoirs. Annual Project Report for Research Work Order No. 76. Prepared for the US Army Corps of Engineers, Savannah District. 179 pp.
  • Peterson, R.C., C.A. Jennings, J.L. Shelton, and J. Zelko. 2007. Culture techniques and ecological studies of larval and juvenile robust redhorse: abundance and distribution in the Oconee River. Annual Project Report (2003) Prepared for Georgia Power Company, Atlanta, GA. 32 pp. (Project Number:25-21-RC-387).
  • Jennings, C.A., J.L. Shelton, R.C. Peterson, and J. Zelko. 2007. Culture techniques and ecological studies of the robust redhorse (Moxostoma robustum): recruitment success, distribution, and abundance of wild-caught larvae and juveniles in the Oconee River, Georgia. Annual Report (2002) Prepared for Georgia Power Company, Atlanta, GA. 41 pp. (Project Number. 25-21-RC295-387)
  • Ruiz, J., D. Dennerline, and C. Jennings. 2007. Fisheries Investigations (2006): Ricahrd B. Russell and J. Strom Thurmond Reservoirs. Annual Report for Research Work Order No. 76. Prepared for the US Army Corps of Engineers, Savannah District. 179 pp.
  • Jennings, C.A., J.L. Shelton, R.C. Peterson, S.C. Shepard, and J. Zelko. 2006. Culture techniques and ecological studies of the robust redhorse (Moxostoma robustum): distribution and abundance of wild-caught larvae in the Oconee River and evalutions of methods for radio telemetry. Annual Report (2001) prepared for Georgia Power Company, Atlanta, GA. 57 pp. (Project Number: 25-21-RC295-387)
  • Mosley, D. L. and C. A. Jennings. 2006. Habitat selection of robust redhorse (Moxostoma robustum) in an experimental mesocosm. Final Project Report submitted to GA Power Company, Atlanta, GA. (Project No. 20-21-RR272-064)
  • Ruiz, J., D. Dennerline, and C. Jennings. 2006. Fisheries Investigations (2005): Richard B. Russell and J. Strom Thurmond Reservoirs. Annual Report for Research Work Order No. 76. Prepared for the US Army Corps of Engineers, Savannah District. 176 pp.
  • Jennings, C.A., J.L. Shelton, Pete Lasier, and Greg L. Looney. 2005. Ecological Studies of robust redhorse (Moxostoma robustum) in the Oconee River, GA. Part1: Distribution and abundance of wild-caught larvae, and radio telemetry determinations of juvenile habitat use and movement patterns. Part 2: impacts and toxic threshold of sediment-associated contaminants to robust redhorse in the lower Oconee River. Annual Report (2000) prepared for Georgia Power Comapany, Atlanta, GA. Part 1 = 52 pp; Part 2= 50 pp. (Project Number: 25-21-RC295-387)
  • Jennings, C. A., J. L. Shelton, and G. L. Looney. 2004. Culture Techniques and Ecological Studies of robust redhorse (Moxostoma robustum): assessment of incubation temperatures and flows, recruitment and recruitment success, and population dynamics. Annual Report (1999) submitted to Georgia Power Company, Atlanta, GA. 63 pp. (Project No. 25-51-RC295-387)
  • Jennings, C. A., J. L. Shelton, E. W. Dilts, and G. L. Looney. 2004. Culture techniques and ecological studies of robust redhorse (Moxostoma robustum): an assessment of reproductive and recruitment success, and percent fine sediment on hatching success. Annual Project Report (1998) Prepared for Georgia Power Company. 45 pp. (project Number. 25-21-RC295-387)
  • Jennings, C. A., and D. C. Shepard. 2003. Movement patterns and habitat use of hatchery-reared juvenile robust redhorse (Moxostoma robustum) released in the Ocmulgee River, GA. Final Project (Project No. 25-21-RC295-515) Report to GA Power Company. 36 pp.
  • Jennings, C. A., and R. S. Weyers. 2003. Temporal and Spatial Distribution of Estuarine-Dependant Species in the Savannah River Estuary. Final Project (#10-21-RR251-148) Report to the Georgia Ports Authority. 152 pp + appendices
  • Jennings, C. A., J. L. Shelton, E. W. Dilts, and G. L. Looney. Culture techinques and ecological studies of robust redhorse (Moxostoma robustum): assessment of reproductive and recruitment success, incubation temperatures and flows, and gravel quality and percent fine sediment on hatching success. Annual Project (Project No. 25-21-RC295-383 {1997}) submitted to GA Power Company, Atlanta, GA. 64 pp.
  • Jennings, C. A. and R. S. Weyers. 2002. Spatial and Temporal Distribution of Esturaine Dependant Fishes in the Savannah River Estuary. Annual Report prepared for Georgia Ports Athority (Project No : 10-21-RR251-148) by the Georgia Cooperative Fish and Wildlife Research Unit. 48 p.
  • Baker, T. L. and C. A. Jennings. 2001. Downstream through-dam movement of advanced Phase II striped bass stocked and Lake Blackshear, Georgia. Final Report to Georgia Department of Natural Resources (Project 10-25-RR251-124). 12 p.
  • Jennings, C. A., J. L. Shelton, and G. L. Looney. 2001. Culture Techniques and Ecological Studies of the Robust Redhorse Moxostoma robustum: assessment of reproductive and recruitment success, incubation temperatures and flows, and gravel quality and percent fine sediment on hatching success. Annual Report (Project 25-21-RC295-387) prepared for Georgia Power Company. 55 p.
  • Will, T. A., T. R. Reinert, and C. A. Jennings. 2001. Assessment of spawning sites and reproductive status of striped bass, Morone saxatilis, in the Savannah River Estuary. Final Project for Project 10-21-RR251-144. Prepared for Georgia Ports Authority. 95 p.
  • Baker, T. L. and C. A. Jennings. 2000. Survival, movement patterns, and habitat use of adult striped bass in Lake Blackshear, GA. Final Project (Project No. 10-25-RR251-122)Report to Georgia Department of Natural Resources. 75 p.
  • Dennerline, D. E., and C. A. Jennings. 2000. Fisheries Investigaitons (1999): Richard B. Russell and J. Strom Thrumond Reservoirs. Final Report for Research Work Order 43. Prepared for the U.S. Army Corps of Engineers (Savannah District)Savannah, GA. 54p + Appendices.
  • Jennings, C. A., B. J. Hess. J. Hilterman, and G. L. Looney. 2000. Population dynamics of robust redhorse (Moxostoma robustum) in the Oconee River, GA. Final Project Report for Research Work Order 52. Prepared for the U.S. Geological Survey, Biological resources Division. Reston, VA 29p.
  • Will, T. A., T. R. Reinert, and C. A. Jennings. 2000. Assessment of the reproductive status of striped bass, Morone saxatilis, in the Savannah River Estuary. Final Report for Research Work Order 47. Prepared for the U.S. Army Corp of Engineers (Savannah District) Savannah, GA. 33 p.
  • Will, T. A., T. R. Reinert, and C. A. Jennings. 2000. Spatial assessment of current and historic spawning sites of striped bass, Morone saxatilis, in the Savannah River estuary. Final Reprot for Project No. 10-21-RR251-131. Prepared for Georgia Department of Natural Resources, Richmond Hill, GA. 33 p.
  • Reinert, T.R. , K. Jefferson, and C.A. Jennings. 1998. Abundance and distribution of striped bass eggs and larvae in the Savannah River estuary--Implications for channel dredging window. Final Report. Savannah District, U.S. Army Corps of Engineers.
 

Current Staff

Federal Staff: 3

Masters Students: 6

Phd Students: 3

Post Docs: 3

University Staff: 4

5 Year Summary

Students graduated: 13

Scientific Publications: 41

Presentations: 133

 

Contact Information

Tel: (706) 542 - 4837

Links of Interest

Current Students

Georgia Cooperative Fish and Wildlife Research Unit Cooperators

  1. Georgia Department of Natural Resources
  2. U.S. Fish and Wildlife Service
  3. U.S. Geological Survey
  4. University of Georgia
  5. Wildlife Management Institute